Solid Square
Solid Line

Back to Sirio Outfitting

CRYSTAL

SERENITY

SYMPHONY

DRY DOCK

APRIL - AUGUST

2023

THE PROJECT

Solid Line

From April to August 2023 Sirio carried out numerous activities on board the Crystal Serenity and the Crystal Symphony during the two ships' stay at ​the Fincantieri shipyard in Trieste.

Thanks to our presence in the area we have managed to manage more than 200 technicians in the various activities, from decorative painting such as ​mother-of-pearl finishing and real silver leaf to the simpler ones of the ceilings in the corridors and common areas, supply and installation of tiles and ​marble, maintenance of the real teak in the external corridors and in the pool area including the re-caulking with the Sika 290DC Pro, the painting of ​the swimming pools and the related resin floors in the beach area, the new mosaic of the Jacuzzi, the total renovation of the crew bar and one crew ​gym as well as the creation of a new crew gym by demolishing six existing cabins, the total conversion of the Casino into a Bridge Lounge, installation ​of carpet and supply and installation of vinyl, polishing of the life boats, total refurbishment of the embarkation area of both ships and various other ​interventions. All with success and customer satisfaction, respecting the times and specifications received and creating a collaboration with the ​customer in finding the best solutions from a technical, aesthetic and economic point of view.

The fact of being from Trieste and having local partners and a carpentry shop a few kilometers from the Shipyard allowed the customer to make ​considerable savings regarding the transport of materials, staff travel and the accommodation. It also allowed us to be efficient and timely in solving ​all problems, even external to our activities, giving the customer a total service that developed day after day.

CRYSTAL SERENITY

Solid Line

DK4 EMBARKATION AREA

Refurbishment (turn-key project)

Demolition of the floor (including redo / preparation of underlay) and ceiling, supply and installation of the new vinyl floor and skirting, re-skin of the ​walls with a new wallpaper for the upper parts and new plastic laminate for the lower parts. Supply and installation of the new ceiling cassettes and ​assemble of the new led lights. Supply of 4 cabinets with marble tops. Supply and installation of new curtains. Supply and installation of new lights and ​wooden profiles.

DK04 – OFFICER BAR

Demolition of the floor, supply and installation of new floor and skirting, re-skin of the walls, new plastic laminate on the bar counter tops.

DK04 – CREW MESS

Supply and installation of new skirting, re-skin of the walls, new sink, new stave of the ceiling

DK04 – CREW BISTRO’

Demolition of the floor (including redo / preparation of underlay), supply and installation of the new floor (wood fin. vinyl). New wallpaper where needed ​and new plastic laminate on the bar counter top

DK04 - OFFICER MESS

Demolition of ceramic floor, supply and installation of the new one

CRYSTAL SERENITY

Solid Line

CREW CABINS

Supply and installation of new cabinets with mirror – 400pcs

General room and toilets maintenance (reskin of wall, new resin floor and bathroom installation)

DK05 - WATERSIDE RESTAURANT

Painting of the ceiling niches with real silver leaf and restoration of the waiter station tops

DK05 – ATRIUM

Strip ceiling painting

DK06 - CASINO’

Conversion from Casino to Bridge Lounge (turn key project)

Carpet replacement. Painting of ceiling in mother-of-pearl finishing, supply and installation of ceiling niches, walls and artwork frames. Supply of the ​new cabinets with strip led lights, provide and installation of decorative balustrades. Creation of the new rounded TV niches. Refurbishment of the ​office.

DK7 & DK12 - OPEN DECK

Teak restoration with total re-caulking and teak replacement where needed. Replacement of the teak caps.

CRYSTAL SERENITY

Solid Line

GUEST CABINS

Re-upholstery of 33 seats – brown with waves (owner supply).

Re-upholstery of 66 white armchairs (owner supply).

Re-upholstery of 8 brown armchairs.

Re-upholstery of 66 sofa cushions 35x35 cm (owner supply).

Re-upholstery of 66 sofa cushions 60x60cm (owner supply)

DK11 - CAPTAIN LOUNGE

Carpet replacement.

DK12 – TRIDENT

Painting of the ceiling behind canvas. Supply and installation of the new canvas. New curtain installation.

DK12 – MARKETPLACE

Carpet replacement. Ceramic tiles replacement (about 450mq). Replacement of curtains. Installation of new plastic laminate on fire doors. Counter ​tops polishing.

CRYSTAL SERENITY

Solid Line

DK12 – PALM COURT

Refurbishment of the wooden stage. Repair and painting of the ceiling of the Bar area. Supply and installation of two doormat on the side entrances

DK12 – POOL AREA

Replacement of the tiles of the walls in the showers, outside low wall of pool and stage. Refurbishment of the pool with new resin and painting cycle. ​Replacement (supply and installation) of new teak benches and teak walls of the hydromassage tubs.

DK13 – TENNIS COURT

Refurbishment of the tennis court, with supply and installation of perimeter net, new net for picckle ball and redo of the floor

LIFE BOAT

Maintenance of the life boat

PUBLIC AREA IN GENERAL

Fixing the RINA notes

and many other small activities...

CRYSTAL SERENITY

Solid Line

CRYSTAL SYMPHONY

Solid Line

DK02 – CREW GYM

Demolition of the floor, installation of the new vinyl skirting and floor, re-skin of the walls and installation of new plastic laminate, supply and ​installation of white ceiling tissue

DK03 – NEW CREW GYM

Demolition of four cabins and creation of a new crew gym. Installation of the new vinyl skirting and floor, restoration of the walls, application of the ​new wallpaper and installation of new plastic laminate, supply and setting of the new ceiling cassettes. Supply of the new B15 doors and doors for the ​technical room

DK04 - EMBARKATION

Refurbishment (turn-key project)

Demolition of the floor (including redo / preparation of underlay) and ceiling, supply and installation of the new vinyl floor and skirting, re-skin of the ​walls with a new wallpaper for the upper parts and new plastic laminate for the lower parts. Supply and installation of the new ceiling cassettes and ​assemble of the new led lights. Supply of 4 cabinets with marble tops. Supply and installation of new curtains. Supply and installation of new lights and ​wooden profiles.

DK04 – CREW BAR

Refurbishment (turn-key project)

Demolition of the floor and installation of the new vinyl floor, painting of the walls and ceiling, installation of new plastic laminate on the walls and on ​the counter tops. New LED lights on the counter tops. Re-upholstery of the blue sofa. Creation of the new Dj booth structure and of the new white ​desk of the market area. Re-skin of walls and ceiling.

CRYSTAL SYMPHONY

Solid Line

DK04 – OFFICER MESS

Demolition and installation of the new vinyl floor and skirting. Installation of the kitchen tiles. Re-skin of the walls, painting of the door and column

CREW CABINS

Supply and installation of new cabinets with mirror – 400pcs

General room and toilets maintenance (reskin of wall, new resin floor and bathroom installation)

DK05 – CONVERSION CABINS

Conversion (turn-key project)

Transformation of 4 crew cabins into two officer cabins. Installation of new carpet (owner supply), painting of the walls, supply and installation of new ​cabinets

DK05 – ATRIUM

Re-upholstery of 3 drop shape sofas

DK05 – WATERSIDE

Maintenance of the counters, demolition and fixing the underlay of the floor of the sides corridors. Supply and installation of new tiles.

CRYSTAL SYMPHONY

Solid Line

DK06 – OUTSIDE AREA AFT

Supply and installation of canopy

DK06 – STARLITE CLUB

Painting of the ceiling, creation of three new ceiling hatches

DK06 – GALAXY LOUNGE

Sand and refinish with transparent of the wooden stage

DK06 – OPEN DECK AFT

Supply and installation of the new tensile structure in the crew area

DK11 – PALM COURT

Refurbishment of the wooden stage. Repair and painting of the ceiling of the Bar area. Supply and installation of two doormat on the side entrances

DK11 – TRIDENT

Painting of the ceiling behind the canvas. Supply and installation of the canvas and the stainless structure. Creation of new hatches on the ceiling of ​the galley area and painting

CRYSTAL SYMPHONY

Solid Line

DK11 – SILK

Replacement of the black and white tiles

DK11 – MARKETPLACE

Replacement of the tiles in front of the counters, supply of 4 waiterstation with marble tops. Installation of new blinds in the aft (owner supply). ​Counter tops polishing. Painting of the wood frames, supply and installation of stainless steel profiles for the counters and balustrades

DK11 – OPEN DECK AFT

Teak restoration with new re-caulking

DK11 – POOL AREA

Teak restoration. Maintenance of the pool with new painting and resin. Replacement of the mosaic in the showers, on the jacuzzi, on the pool ​perimeter, on the stage

DK12 – TENNIS COURT

Replacement of the resin floor. Change of the net in tennis court and golf courts

DK13 – SHIP SIGN

Replacement of the led light sign

and many other small activities...

CRYSTAL SYMPHONY

Solid Line